top of page
  • Foto do escritor: Cristiano Roberto de Souza
    Cristiano Roberto de Souza
  • 3 de ago. de 2020
  • 1 min de leitura

Atualizado: 21 de jan. de 2022

Alternative studies, preparation of the draft and final designs for macro-drainage, micro-drainage, paving and other complementary works in the hydrographic sub-basins of the Jaguarão and Bucarein rivers, as well as in the directly affected area of ​​the Cachoeira river, in the municipality of Joinville, Santa Catarina.


The works will be Developed for the Municipal City Hall of Joinville, based on the guidelines issued by the 2011 Master Plan for Urban Drainage of the Cachoeira River Basin, prepared by ENGECORPS itself, with the aim of mitigating flood risks, which should include:

  • The identification of alternatives to be consolidated in the draft, considering its technical, environmental, economic and social feasibility;

  • Consolidation of alternatives;

  • Preparation of the draft and final designs and other technical elements of the set of chosen works.

1438 | Estudos de alternativas, elaboração do anteprojeto e dos projetos executivos das obras de macrodrenagem, microdrenagem, pavimentação e outras complementares nas sub-bacias hidrográficas dos rios Jaguarão e Bucarein, bem como na área diretamente afetada do rio Cachoeira, no município de Joinville em Santa Catarina.

 
 
bottom of page