top of page

Environmental Studies and Final Design of the Mooca Stream Flood Containment Reservoir - Mooca Reservoir 02


The works will be carried out for the Municipal City Hall of São Paulo with the purpose of studying and detailing the Mooca stream's flood containment reservoir – MO-02, located at the intersection between Luiz Ignácio de Anhaia Mello and Jacinto Menezes Palhares Avenues, where it comes from. with constant flooding and flooding due to the most intense rainfall.


Planned activities:

  • Diagnosis of the current situation, topographic and cadastral surveys and geological-geotechnical investigations.

  • Review of hydrological studies and basic hydraulic design.

  • Comparative study between the alternative solutions identified in the Basic Design and technical dimensioning of each project area.

  • Earthworks, structural, electrical and building projects (command house).

  • Interference relocation studies and projects.

  • Urban and landscape design and complementary environmental services.

  • Technical specifications, quantity and budget spreadsheet.

1418 | Reservatório de Contenção de Cheias do Córrego Mooca.

bottom of page