The designs will be developed for BRK Ambiental, covering the Ibura, Jardim São Paulo and Curado Sewage Systems, and will treat the sewage generated both in urban areas and in expanding areas.


The Sewage Treatment Station will be implemented in stages or in modules:

1st stage: a flow equalization tank (Influent Buffer) and two Nereda reactors will be built;

2nd stage: two more Nereda reactors will be built, identical to the previous ones mentioned in the 1st stage;

3rd stage: a flow equalization tank (Influent Buffer) and a Nereda reactor will be built;

4th stage: the last module of the Nereda reactor will be built.


General data:

  • Flow at the end of the 4th stage: 946.2 l/s;

  • Final population served: 570,838 inhabitants.