Preparation of study of alternative areas for the implementation of the raw water intake and adduction system and of the ETA VI pre-treatment unit and adequacy of the existing final design.
The works will be executed for the Autonomous Water and Sewage Service of Indaiatuba - SAAE including:
Study of alternative areas for the implementation of the Jundiaí river raw water intake and adduction system, and the pre-treatment system, with a capacity of 300 l/s;
Final design of the systems in its two stages;
Final design of the primary cabin to serve the raw water collection and pre-treatment units;
Hydrological studies, hydraulic dimensioning and preparation of the final design for the threshold for raising the water level of the Jundiaí River;
Environmental studies;
Adequacy of the existing final design (ETA VI and other units), due to the new location of the units; and,
Preparation of a technical package for bidding on the works.