HIDROELECTRIC FACILITY OF BELO MONTE

Cliente:

Norte Energia S.A.

Serviços:

Dam break (hypothetical rupture) studies, flood map, preparation of the Emergency Action Plan (PAE) and the Safety Plan of Dams of the HPP Belo Monte Complex. The Hydroelectric Power Plant of Belo Monte is being built in the basin of Xingu river, in the roundabouts of the Municipality of Altamira, in the north of the state of Pará; its installed power will be of 11,233 MW, being that the plant area is 516 km². This reservoir is configured by the dams of Belo Monte Site, the dam of Santo Antônio slope and the main dam located in Pimental Site, also having over 28 dikes, totaling 31 dams.