HIDROELECTRIC PLANT OF CANA BRAVA
Cliente:
Inter American Development Bank
Serviços:
"Local Engineering Firm" - follow-up and supervision of HPP Cana Brava construction works, in the State of Tocantins, including the inspection, diligence and follow-up of the assembly of electromechanical equipment. Installed Power: 472 MW; Assured Energy: 274 MW; Total Gross Ceiling: 48 m. Land Dams - Left Margin: 308.50 m extension, 66 m high and 1,415,000 m ³ landfill volume - Right Margin: 398.50 m of extension 53 m high and 831,200 m³ of landfill volume; CCR Right Margin: 91.30 m long, 54 m high and 91,500 m³ concrete volume.