ITABIRUÇU – DAM AND WASTE PILE
Cliente:
Companhia Vale do Rio Doce - VALE
Serviços:
Final design for stabilization and rehabilitation of the Itabiruçu Waste Pipe (PDE), as well as the final stretch of the “Canga” Pile Drainage Canal, which is discharged at the Itabiruçu PDE, followed by the design of the final design for the 3rd stage of the Itajiruçu Tailings Dam. Final designs were also developed for the reconstruction of a section of the contour road of the reservoir and relocation of the stretches to be affected by the future occupation of the tailings. The project area is located in the Itabira mining complex, in Conceição Mine, Itabira Iron Ore District, State of Minas Gerais. The project solutions provided for the landscape integration of PDE, which is located on one of the slopes of the Itabiruçu tailings dam.